Category: Collaborations

Private Residence, Lake Tahoe NV

MMS worked closely with the fabricator to provide detailed approval and fabrication drawings for this elegant 5 story steel stair with glass treads. Final installation was within 1/8” tolerance vertically over the 5 floors.

Entrance Trellises, Cambridge MA

MMS provided coordination with other trades and fabrication, to a local misc. metal fabricator on these (4) garden trellises. The units were shipped fully assembled and installed in 2 days.